Seating
Björn Dahlström, 2026
FOGIA
Materials: Solid oak, plywood core, elastic webbing, foam, and textile
Dimensions:
W 18.1" D 37.8" H 31.1" SH 16.5" SD 17.7" SW 18.1"
Wood Finish: Black Stained Oak, Light Stained Oak, Natural Lacquered Oak, Smoked Stained Oak
Upholstery: COM, Cat A–J in Ecriture/Kvadrat, Hallingdal 65/Kvadrat, Barnum/Nevotex, Karakorum/Dedar or in Sheepskin/Skandilock.
Estimated Lead Time: 12–16 weeks
Norm Architects, 2026
MALTE GORMSEN KOLLEKTION
Materials: Oak
Dimensions: H 16.5" Ø 15.7"
Options: Oak in Nature, Raw Nature, Light Nature, Dark Nature, Smoked or Soap. MG715 seat cushion available as an optional add-on.
The MG406 is available in stone here.
Estimated Lead Time: 12–16 weeks
Louise Roe, 2025
LOUISE ROE
Materials: Solid oak or beech wood
Dimensions: H 31.8" W 20.4" D 18.89"
Options: Natural Oak, Black Stained Oak, Smoked Oak, Lacquered Black, Lacquered Olive, Pine Wood
Estimated Lead Time: 12–16 weeks
Space CPH, 2026
MALTE GORMSEN KOLLEKTION
Materials: Oak or beech with natural paper cord
Dimensions:
Kitchen Stool: H 25.6" L 19.7" × D 22.2"
Bar Stool: H 29.5" L 19.7" × D 22.2"
Options: Available in Kitchen Stool (25.6") and Bar Stool (29.5”). Oak in Nature, Raw Nature, Light Nature, Dark Nature, Smoked or Soap. Beech in Light Nature.
Estimated Lead Time: 12–16 weeks
Matteo Fogale, 2026
ORIGIN MADE
Materials: Solid wood frame in ash, smoked ash, oak or walnut with upholstered seat and back
Dimensions: L 50.4" W 38.2" H 31.5" SH 19.1"
Options: Wood in ash, smoked ash, oak, or walnut and upholstery in groups X, A or B
Matching sofa available here.
Estimated Lead Time: 16 - 20 weeks
Magnus Sangild & Vúóng Kim Daniel, 2025
MAZO
Materials: Black powder-coated steel legs with varnished FSC®-certified oak seat structure, or fully varnished oak legs. Upholstered seat and back.
Dimensions: W 19.6" D 21.6" H 31.1" SH 18.1"
Options: Legs in black powder-coated steel or fully varnished oak. Upholstery in eight category groups (Cat 1–Cat 8), or COM/COL. Gliders included as standard.
Estimated Lead Time: 12-16 weeks.
Louise Roe, 2025
LOUISE ROE
Materials: Solid oak or beech wood with brushed stainless steel footrest (finish dependent)
Dimensions: H 53.5" D 16.5"
Options: Natural Oak, Black Stained Oak, Smoked Oak, Lacquered Black, Lacquered Olive, Pine Wood
Estimated Lead Time: 12–16 weeks
Matteo Fogale, 2026
ORIGIN MADE
Materials: Solid wood frame in ash, smoked ash, oak or walnut with upholstered seat and back.
Dimensions: L 94.5" W 40.2" H 31.5" SH 19.1"
Options: Wood in ash, smoked ash, oak or walnut and upholstery in groups X, A or B
Matching chair available here.
Estimated Lead Time: 16 - 20 weeks
Jean-Marie Massaud, 2026
ZANAT
Materials: Solid European hardwood, Danish paper cord or upholstered seat and backrest
Dimensions: W 28.4" D 31.1" H 26.8"
Options: Available in maple black, oak oil, or oak white oil, or walnut oil. Seat and backrest in woven Danish paper cord (natural or black) or upholstered in Kvadrat Gentle colors 0963, 0873, 0553 or COM fabric/leather
Estimated Lead Time: 12-16 weeks
Louise Roe, 2025
LOUISE ROE
Materials: Solid oak or beech wood (finish dependent)
Dimensions: H 18.5" W 18.1" D 16.5"
Options: Natural Oak, Black Stained Oak, Smoked Oak, Lacquered Black, Lacquered Olive, Pine Wood
Estimated Lead Time: 12–16 weeks
Grazia & Co, 2026
GRAZIA & CO.
Materials: Ply seat and backrest with foam and specified upholstery. Powder-coated mild steel or linished stainless steel rod frame with brass or stainless steel footrail.
Dimensions:
Counter Stool W: 22.4" D: 18.9" H: 38.6" SH: 25.6"
Bar Stool W: 22.4" D: 18.9" H: 42.5" SH: 29.5"
Options: Powder-coat frame in house finishes (mannex white, mannex suede, APO grey, mannex black) or premium colours. Linished stainless steel frame also available. Footrail in natural brass or stainless steel. Upholstery in vinyl, leather, sheepskin, alpaca velvet, boucle, linen weave or soft textured weave. Matching or contrast piping available. COM or COL on request.
Estimated Lead Time: 12-16 weeks.
Palomba Serafini Associati, 2026
ZANAT
Materials: Solid European hardwood
Dimensions: W 43.3" D 17.7" H 16.5"
Options: Available in maple black or walnut oil.
Estimated Lead Time: 12-16 weeks
Henrik Hvid Hansen, 2026
SIBAST
Materials: High resilience foam with upholstered seat and back on swivel base in black powder-coated steel or brushed stainless steel
Dimensions:
Without Arms: W 24.4" D 27.6" H 29.1" SH 15" SD 21.7" SW 24.4"
With Arms: W 30.3" D 27.6" H 29.1" SH 15" SD 21.7" SW 24.4"
Base: Black powder-coated steel or brushed stainless steel. Standard glides without felt. Felt glides available separately.
Upholstery: Fabric categories 01–11, COM fabric and COM leather. COM materials must be pre-approved by Sibast. Not all fabric and leather types are suitable for the Primum Lounge Chair.
Estimated Lead Time: 12–16 weeks
Kensaku Oshiro, 2024
dk3
Materials: Chrome or black powder-coated steel frame with upholstered seat and back. Felt glides pre-mounted.
Dimensions: W 31.5" D 26.4" H 24.8" SH 14.6" SD 20.5" SW 19.7"
Options:
Frame: Black powder-coated steel or chrome-plated steel. Felt glides are pre-mounted.
Upholstery: Category 1, 2, 4, and 9. The armrest is handsewn; slight variations are inherent to the process.
Estimated Lead Time: 12–16 weeks
Magnus Sangild & Vúóng Kim Daniel, 2025
MAZO
Materials: Black powder-coated steel legs with varnished FSC®-certified oak seat structure, or fully varnished oak legs. Upholstered seat and back.
Dimensions:
Counter Stool H 36.2" W 18.1" D 19.7" SH 25.5"
Bar Stool H 40.2" W 18.1" D 19.7" SH 29.5"
Options: Legs in black powder-coated steel or fully varnished oak. Upholstery in eight category groups (Cat 1–Cat 8), or COM/COL. Gliders included as standard.
Estimated Lead Time: 12-16 weeks.
Tables
Norm Architects, 2026
KARIMOKU CASE
Materials: Solid oak or keyaki wood
Dimensions:
W 21.7" D 18.3" H 15.8"
Wood: Pure Oak, Smoked Oak, Grain Matte Black, Keyaki Brown
Estimated Lead Time: 12–16 weeks
Hallgeir Homstvedt, 2026
ARIAKE
Materials: Solid Oak/Ash or Walnut
Dimensions: D 35.4" H 28.7" Available in lengths: 63", 71", 78.5", 86.5" or 94.5"
Options: Available in oak and ash with four surface treatments (Natural, White, Sumi, Smoke) and in walnut, across five lengths.
Estimated Lead Time: 16–20 weeks
Norm Architects
Materials: Solid oak or travertine
Dimensions: H 19.7" Ø 31.5"
Options: Oak or travertine
Estimated Lead Time: 12-16 weeks
Patrick Norguet, 2026
ZANAT
Materials: Solid wood
Materials: Solid European hardwood
Dimensions:
L 94.5" D 39.4" H 30"
L 110.2" D 39.4" H 30"
L 133.9" D 39.4" H 30"
Options: Available in maple black, oak oil, oak white oil, or walnut oil. Carving patterns: Tiny Touch or Grooves. Dimensions can be customized
Estimated Lead Time: 12-16 weeks
Louise Roe, 2025
LOUISE ROE
Materials: Solid stone (Estremoz Marble or Ataija Azul Marble)
Dimensions: H 14.2" D 47.2"
Stone Options: Estremoz Marble or Ataija Azul Marble. Natural variation in veining and tone means no two pieces are exactly alike.
Estimated Lead Time: 12–16 weeks
Palomba Serafini Associati, 2026
ZANAT
Materials: Solid European hardwood
Dimensions: Ø 14.2" H 22"
Options: Available in maple black stain, maple wenge stain, or walnut oil.
Estimated Lead Time: 12-16 weeks
Louise Roe, 2025
LOUISE ROE
Materials: Solid oak or beech wood (finish dependent)
Dimensions: H 20.5" D 35.4"
Options: Natural Oak, Black Stained Oak, Smoked Oak, Lacquered Black, Lacquered Olive
Estimated Lead Time: 12–16 weeks
Ladies & Gentlemen Studio, 2026
ARIAKE
Materials: Solid Oak/Ash or Walnut
Dimensions: W 50.9" D 24.9" H 11.8"
Options: Available in oak and ash with five surface treatments (Natural, White, Sumi, Smoke, Indigo) and in walnut.
Estimated Lead Time: 16–20 weeks
Anne Boysen, 2026
dk3
Materials: MDF with glossy lacquered finish
Dimensions:
Small: W 47" D 18" H 32.5"
Large: W 71" D 19.5" H 33.5"
Options: Glossy Off-White or Glossy Oxblood finish
Estimated Lead Time: 12–16 weeks
Ladies & Gentlemen Studio, 2026
ARIAKE
Materials: Solid Oak/Ash or Walnut
Dimensions: W 15.7" D 14.2" H 15.7"
Options: Available in oak and ash with five surface treatments (Natural, White, Sumi, Smoke, Indigo) and in walnut.
Estimated Lead Time: 16–20 weeks
Falke Svatun, 2026
ORIGIN MADE
Materials: Solid ash, smoked ash, oak or walnut wood
Dimensions: L 53.1" W 35.8" H 15.7"
Options: Ash, smoked ash, oak, walnut
Estimated Lead Time: 16 - 20 weeks
Michele De Lucchi, 2026
ZANAT
Materials: Solid European hardwood
Dimensions: Ø 12.6" H 16.5"
Options: Available in maple black or walnut oil. Disc available with or without handles.
Estimated Lead Time: 12-16 weeks
Outdoor
Storage
MAIN, 2026
FOGIA
Materials: Solid Oak
Dimensions: Various heights and widths based on custom configurations. Shelf depth 11.8”
Example Configurations;
Bond 30 FS203: W 54.3” D 11.8” H 27.2”
Bond 30 FS206: W 54.3”D 11.8” H 67”
Bond 30 FS304: W 78” D 11.8” H 41.7”
Bond 30 FS306: W 78” D 11.8” H 67”
Freestanding floor panel D: 15.7”
Options: Freestanding, wall or ceiling mounted. Can be customized in a number of configurations. Available in lacquered oak or smoked oak. Optional movable upholstered screens in Kvadrat Technicolor. Please contact us for custom pricing.
Lead Time: 10 - 14 weeks
Carl-Gustaf Hiort af Ornäs, 1955
ORNÄS
Materials: Solid oak, birch, or walnut. Lacquered finish.
Dimensions:
W 47.2" D 19.7" H 33.9" (120 cm)
W 55.1" D 19.7" H 33.9" (140 cm)
W 70.9" D 19.7" H 33.9" (180 cm)
W 86.6" D 19.7" H 33.9" (220 cm)
Options: The 47.2" and 55.1" versions have two sliding doors, while the 70.9" and 86.6" versions have three. The 86.6" version also includes a central support leg.
Estimated Lead Time: 12–16 weeks
Gabriel Tan, 2026
ORIGIN MADE
Materials: Solid ash, smoked ash, oak or walnut wood
Dimensions:
Low: L 68.9" W 11.8" H 37.4"
Tall: L 47.2" W 11.8" H 61"
Options: Available in low and tall configurations, in ash, smoked ash, oak or walnut
Estimated Lead Time: 16 - 20 weeks
Rugs
Gabriel Tan Studio, 2026
ORIGIN MADE
Materials: New Zealand wool and fine New Zealand wool
Dimensions: Ø94.5"
Estimated Lead Time: 12 - 16 weeks
Gabriel Tan Studio, 2026
ORIGIN MADE
Materials: New Zealand wool and fine New Zealand wool
Dimensions: 118" x 79"
Estimated Lead Time: 12 - 16 weeks
Gabriel Tan Studio, 2026
ORIGIN MADE
Materials: Cotton and jute
Dimensions: 118" x 79"
Estimated Lead Time: 12 - 16 weeks
Gabriel Tan Studio, 2026
ORIGIN MADE
Materials: Cotton
Dimensions: 118" x 79"
Estimated Lead Time: 12 - 16 weeks
Gabriel Tan Studio, 2026
ORIGIN MADE
Materials: Cotton
Dimensions: 118" x 79"
Estimated Lead Time: 12 - 16 weeks
Lighting
Daniel Becker, 2024
MOSS OBJECTS
Materials: Pressed aluminium with plexiglass diffuser and textile-covered cables
Dimensions:
Dune 6 Spiral — W 27.5" D 28.7" H 18.8"
Dune 8 Spiral — W 26.7" D 29.5" H 31.5"
Dune 10 Spiral — W 39.3" D 28.3" H 51.2"
Dune 12 Spiral — W 49.2" D 26.5" H 51.2"
Dune 16 Spiral — W 63.7" D 39.7" H 41.3"
Dune 20 Spiral — W 107" D 39.3" H 56.3"
Options: Silver anodized, silver polished, gold tone, copper tone, or dark bronze tone. Custom colors and configurations available on request.
UL Listing available from $435–$775 depending on configuration
Estimated Lead Times: 10-12 weeks
Daniel Becker, 2019
MOSS OBJECTS
Materials: Sheet steel, wet painted, with plexiglass diffuser, oak timber crossbars (waxed), and textile covered cables
Dimensions: Ø 48.4" H 106.3"
Options: Anthracite semi-matte, white semi-matte, black high gloss, gold tone, copper tone, dark bronze tone, or oxidized steel. Wood frame in oiled oak, dark stained oak or black oak. Custom colors and configurations available on request.
UL Listing available for $500
Estimated Lead Times: 10-12 weeks
Kwangho Lee
LAMBERT ET FILS
Materials: Aluminum body and anchors. Acrylic light diffuser. Atelier version with enamel-glazed copper plates
Dimensions: L 11.5" H 15.25" D 8"
Cord length: 72"
Options: Aluminum finish. Atelier version with enamel-glazed copper plates in Bluish black, Steel grey, Flame orange, and Titanium white
Estimated Lead Times: 12 weeks
Partisans, 2016
PARACHILNA
Material: Thermoformed acrylic with extruded aluminum profile housing an LED strip
Dimension:
Gweilo Qin PE: H 47.2" / W 25.6"
Gweilo Qin GR: H 59.1" / W 33.5"
Options: Available in golden anodised or silver anodised finishes
UL Listed: No
Estimated Lead Time: Quick ship models 4 weeks / Otherwise 12-16 weeks
Parachilna Design Team
PARACHILNA
Material: Natural alabaster
Dimension:
Petra M PE: Ø 6.3" / H 6.3" / base Ø 3.1"
Petra M ME: Ø 15.7" / H 15.3" / base Ø 6.3"
Petra M GR: Ø 19.7" / H 18.9" / base Ø 7.5"
UL Listed: No
Estimated Lead Time: Quick ship models 4 weeks / Otherwise 12-16 weeks
Daniel Becker, 2019
MOSS OBJECTS
Materials: Steel shade with plexiglass diffuser and oak frame with textile covered cables
Dimensions: W: 43.3” D: 43.3” Variable height
Options: Anthracite semi-matte, white semi-matte, black high gloss, gold tone, copper tone, dark bronze tone, or oxidized steel. Wood frame in oiled oak, dark stained oak or black oak. Custom colors and configurations available on request.
UL Listing available for $350
Estimated Lead Times: 10-12 weeks
Daniel Becker, 2024
MOSS OBJECTS
Materials: Pressed aluminium with plexiglass diffuser and textile-covered cables
Dimensions:
Dune 6 Vertical Cluster — Ø 23.6" H 43.3"
Dune 8 Vertical Cluster — Ø 23.6" H 54.7"
Dune 10 Vertical Cluster — Ø 24.8" H 66.5"
Options: Silver anodized, silver polished, gold tone, copper tone, or dark bronze tone. Custom colors and configurations available on request.
UL Listing available from $435–$700 depending on configuration
Estimated Lead Time: 10-12 weeks
Partisans, 2016
PARACHILNA
Material: Thermoformed acrylic with extruded aluminum profile housing an LED strip
Dimension:
Gweilo Zhou V PE: H 43.7" / W 23.6" / cable length 196.8" / canopy Ø 7.9"
Gweilo Zhou V GR: H 54.7" / W 23.6" / cable length 196.8" / canopy Ø 7.9"
Options: Available in golden anodised or silver anodised finishes
UL Listed: No
Estimated Lead Time: 12-16 weeks
Daniel Becker, 2019
MOSS OBJECTS
Materials: Sheet steel, wet painted, with plexiglass diffuser and textile covered cables
Dimensions:
Emily I — Ø 19.7" H 13.8"
Emily II — Ø 15.8" H 14.6"
Options: Anthracite semi-matte, white semi-matte, black high gloss, gold tone, copper tone, dark bronze tone, or oxidized steel. Custom colors available on request.
UL Listing available for $300
Estimated Lead Times: 10-12 weeks
Guido Valín, 2024
PARACHILNA
Material: Electropolished stainless steel structure with translucent methacrylate shades
Dimension:
Topuro S: H 9.4" / Ø 7.1"
Topuro L: H 17.7" / Ø 11.8"
Options: Topura L available in indoor or outdoor version with IP-65 rating
UL Listed: No
Estimated Lead Time: Quick ship models 4 weeks / Otherwise 12-16 weeks
Kwangho Lee
LAMBERT ET FILS
Materials: Aluminum body and anchors. Acrylic light diffuser and polyurethane cord. Atelier version with enamel-glazed copper plates
Dimensions: L 10" H 60" D 8"
Cord length: 96"
Options: Aluminum finish. Atelier version with enamel-glazed copper plates in Bluish black, Steel grey, Flame orange, and Titanium white
Estimated Lead Times: 12 weeks
Daniel Becker, 2024
MOSS OBJECTS
Materials: Pressed aluminium with plexiglass diffuser and textile-covered cables
Dimensions:
Dune 4 Curve — W 29.5" D 23.2" H 13.8"
Dune 6 Curve — W 47.2" D 22" H 17.7"
Dune 8 Curve — W 50.8" D 31.5" H 19.3"
Dune 10 Curve — W 63.5" D 37.8" H 15"
Dune 12 Curve — W 80.3" D 39" H 15.8"
Dune 16 Curve — W 116.5" D 40.2" H 15.8"
Dune 20 Curve — W 148" D 42.5" H 16.5"
Options: Silver anodized, silver polished, gold tone, copper tone, or dark bronze tone. Custom colors and configurations available on request.
UL Listing available from $350-$775 depending on configuration
Estimated Lead Times: 10-12 weeks
Kwangho Lee
LAMBERT ET FILS
Materials: Aluminum body and anchors. Acrylic light diffuser and polyurethane cord. Atelier version with enamel-glazed copper plates
Dimensions:
Bolda 01A: L: 10" H: 7.5" D: 8.4"
Bolda 01C: L: 30" H: 7.5" D: 8.4"
Bolda 01E: L: 50" H: 7.5" D: 8.4"
Cord length: 120"
Options: Aluminum finish. Atelier version with enamel-glazed copper plates in Bluish black, Steel grey, Flame orange, and Titanium white
Download 3D files: 01A | 01C | 01E
Estimated Lead Times: 12 weeks
Daniel Becker, 2024
MOSS OBJECTS
Materials: Pressed aluminium with plexiglass diffuser and textile covered cables
Dimensions:
Dune 6 Cluster — W 30.3" D 25.2" H 27.2"
Dune 8 Cluster — W 37.4" D 28.4" H 27.2"
Dune 10 Cluster — W 52" D 27.2" H 30.3"
Dune 12 Cluster — W 59.5" D 27.2" H 30.3"
Dune 16 Cluster — W 58.3" D 38.2" H 30.3"
Dune 20 Cluster — W 66.5" D 34.7" H 41.7"
Options: Silver anodized, silver polished, gold tone, copper tone, or dark bronze tone. Custom colors and configurations available on request.
UL Listing available from $435–$775 depending on configuration
Estimated Lead Time: 10-12 weeks
Daniel Becker, 2024
MOSS OBJECTS
Materials: Pressed aluminium with plexiglass diffuser and textile-covered cables
Dimensions:
Dune 4 Vertical Line — Ø 12.2" H 47.2"
Dune 6 Vertical Line — Ø 13" H 68.9"
Dune 8 Vertical Line — Ø 12.2" H 90.6"
Options: Silver anodized, silver polished, gold tone, copper tone, or dark bronze tone. Custom colors and configurations available on request.
UL Listing available from $350–$550 depending on configuration
Estimated Lead Time: 10-12 weeks
Norm Architects, 2026
KARIMOKU CASE
Materials: Solid oak or keyaki wood with maple, upholstered, or leather seat
Dimensions: W 22.4" D 20.5" H 28" SH 17.9"
Timber: Pure Oak, Smoked Oak, Grain Matte Black, Keyaki Brown
Seat: Steelcut Trio 3, Hallingdal 65, Vidar 4, Coda 2, Leather (Leabelle)
Estimated Lead Time: 12–16 weeks
Download 2D / 3D files
View Finish Options